The following information is for reference only
Installation and wiring
Forklifts can be used to lift the chassis for loading and unloading, or lifting tools such as cloth bags can be used
for lifting. Fix the equipment with expansion screws.
The wiring adopts a 2.5 square copper core cable and three-phase five wire wiring. The fluctuation of power
supply voltage shall not exceed 380V± 15%.
After correctly connecting the wires, close the circuit. Start, oil pressure is normal.
Parameters
Working voltage: SH-YT-300 (500800) external 380V, three wire four wire AC power supply. The neutral line must
be connected.
Set the relevant pressure data for the wire rope pressure head.
Operating procedures
This pressing machine is mainly designed for steel wire rope pressing heads. Solved the problem of high manual
insertion and weaving intensity in the past, and improved production efficiency and safety. Enterprises, workshops,
processing workshops, storefront operations, and other places can all be used.
After setting the relevant parameters, start the equipment and the oil pressure is normal. Put the steel wire rope into
the sleeve and put it into the mold. The foot switch controls the stroke of the oil cyinder for compression molding.
Easy to operate, convenient for one person to work, time-saving and labor-saving.
Faults and alarms
ln case of emergency, press the emergency stop button to stop the machine.
The equipment has various safety protection measures such as overvoltage, overcurrent, overload, overheating,
undervoltage, and undervoltage.
Security and Maintenance
During the work process, it is important to coordinate the running speed well. Avoid safety accidents caused by
high-speed operation.
Do not overload the operation to avoid damaging the equipment or burning out the motor and electrical
components.
Regularly clamp lubricat ing oil on the gearbox and observe the temperature rise and noise of the motor. If the
temperature rise exceeds 85 degrees, stop the machine for inspection.